Welcome!

Life is never dull!

Home
Contact Us
About Us
Site Map
19 Doncaster Trail
Kite Flying
Nana's Birthday
Brigatti Racing
 
  
Dig Finally Occurs

Kelly & Lynne at the site
Sunday Afternoon May 20th, 2007
Documenting the progress

Monday May 21st, 2007 at 1:00 pm
The dig has finally begun!
 


Foundation at East Wall near Garage bump out

Foundation at Family Room South East Corner

Scape Well Window opening

Drain N Wrap on West Wall of foundation

West Wall of foundation

Framing from corner of Dining Room with Scape Well window visable

Foundation for garage and floor framing

Front Entrance and Living Room windows at corner near entrance to the Flag Lot properties

Garage and Front Entrance

Dining Room window and bump out, the Kitchen window, and the Dinette bump out.

View from the street looking at the driveway and garage

Fireplace bump out off the Family Room East Wall

Garage Six by Twelve Bump out

Looking from the Family Room into the Dinette and Kitchen with the entrance to the Dining Room in the background

Looking out the front entrance

Living Room Looking from front entrance with Dining Room to the left

Dining Room with bump out for China Buffet & Hutch

View from the east side

A mail box with the address.

View of the porch, front door and living room windows.  Master bedroom is above the living room.

Interior of the family room Wall of Windows.

Master Bedroom facing North.

Kelly's bedroom on the second floor above the dinette.

Outside view of the wall of windows.

Kitchen window, dinette bump out with french door, and part of the wall of windows.

Dinette bump out.

Garage with 6 by 12 bump for storage.

Family Room begins to take shape.

Porch begins to become visible.

Roof trusses in place and gable is now in place.

Starting to look more like the architectural renderings.

West side of the house.

South wall.

Rear wall.

This view is from the rear of the lot, where the flag lot begins.

Rear of house on final day of framing, June 18th, 2007.

Final framing touches.

Windows should be installed this afternoon.

Some of the windows.

Windows for the living room.

A neighborhood begins to take shape.

Windows.

More windows.

Next a roof.

Scape well window surround waiting for installation.

In place awaiting final grading and window installation.

Steps out for safety.

Finished roof at the south side of the house.

Finished roof on the front of the house.  (North Side)

 

 

 

 

 


 

Announcements
Mechanical installation and rough in has begun for the hvac system.  All utilities for this area, including Road Runner are underground. Final dry wall, electric, and hvac are next, followed by carpet and flooring.